翻訳と辞書
Words near each other
・ Schwanden, Glarus
・ Schwandorf
・ Schwandorf (district)
・ Schwandorf station
・ Schwandorf–Furth im Wald railway
・ Schwanebeck
・ Schwanefeld
・ Schwanengesang
・ Schwanenstadt
・ Schwanenstein
・ Schwanenwerder
・ Schwanewede
・ Schwanfeld
・ Schwangau
・ Schwanheide
Schwanheide station
・ Schwanheim
・ Schwanheim (Frankfurt am Main)
・ Schwanheim, Rhineland-Palatinate
・ Schwanitz
・ Schwann
・ Schwann (record label)
・ Schwann catalog
・ Schwann cell
・ Schwannoma
・ Schwannomatosis
・ Schwansee
・ Schwansen
・ Schwansen (Amt)
・ Schwanstetten


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Schwanheide station : ウィキペディア英語版
Schwanheide station

| platforms = 2
| tracks =
| connections =
| code =
| architect =
| architectural_style =
| opened = 1 December 1886
| closed =
| passengers =
| pass_year =
| website =
}}
Schwanheide station was a border station during the division of Germany on the Berlin–Hamburg Railway in the German Democratic Republic. It is in the Mecklenburg town of Schwanheide, which is now in the state of Mecklenburg-Vorpommern. With the upgrade of the Berlin–Hamburg railway under the German Unity Transport Projects, the former railway station was reduced in status to a “halt”.
==History==

Schwanheide station was opened on 1 December 1886.〔 〕 Originally, the station only offered passenger services. From 1 May 1908, the station catered for freight traffic〔 〕 and was equipped with a loading dock.

After the Second World War, the Berlin–Hamburg railway between Schwanheide and Büchen was divided by the Inner German border. On the eastern side, one of the two main tracks between Berlin and Schwanheide was dismantled for reparations. Even on the West German side, the second track was also dismantled between the former border station of Büchen and Schwarzenbek.
Traffic was initially completely interrupted at the demarcation line, especially since the bridges over the Elbe–Lübeck Canal in Büchen had been destroyed. In the summer of 1946, the bridge was restored, but freight operations were not resumed until 27 August 1947. First, it was agreed that a pair of passenger trains could also run, but they were not introduced. For the time being three through freight trains each day ran in each direction and were handed over between Büchen and Schwanheide. In the autumn of the same year it was agreed to operate additional freight trains. During the Berlin Blockade in 1948, traffic decreased significantly, but did not come to a complete standstill. On 10 September 1949, passenger traffic was resumed with two pairs of trains, one operated by railcars of the Cologne class (''Bauart Köln''), which were derived from the Flying Hamburger.〔
The cross-border rail service on the more northerly route between Herrnburg and Lübeck was closed in 1952; it was restored in 1960. In 1953, ten regular and three as-required freight trains ran on the Berlin–Hamburg line towards the west and five regular and three as-required freight trains ran towards the east. In 1953, a hut was established for transit clearance on platform 1 and a second platform track and an island platform were built. This was later followed by the building of platform tracks 3 and 4.
Freight trains in transit to and from West Berlin stopped in Schwanheide from 1965. However, the track capacity in Schwanheide was not sufficient to carry out border control procedures for passengers and freight. Therefore, freight trains were handled in Kuhlenfeld station, which was 18 km from the border. Before departure of a freight train from the so-called "wagon border crossing" (''Wagengrenzstelle'') at Kuhlenfeld, it had to be ensured that Boizenburg and Schwanheide stations could take the train. If the train had to make an intermediate stop, the border controls would have to be repeated in Schwanheide, which led to delays for other trains.〔

A new terminal building was built in the early 1980s. As a result of Die Wende (the change), express trains no longer stopped in Schwanheide after 30 September 1990.〔 With the upgrade of the line as part of the German Unity Transport Projects (''Verkehrsprojekte Deutsche Einheit''), the section between Hagenow Land and Büchen via Schwanheide was electrified in 1996. The tracks through the station were reduced to two through tracks and so the station was reduced in status to a ''Haltepunkt'' (meaning “halt”, which is Germany describes a station without points). With a further upgrade of the line to a top speed of 230 km/h in 2004/2005, the level crossing near the station was replaced by an underpass.〔 〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Schwanheide station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.